{"id":1001,"date":"2020-02-22T00:28:00","date_gmt":"2020-02-21T23:28:00","guid":{"rendered":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/jobs\/ve-anlage-mit-uf-uo-edi-kraftwerk-simmering-wien-energie\/"},"modified":"2020-05-18T16:21:59","modified_gmt":"2020-05-18T14:21:59","slug":"ve-anlage-mit-uf-uo-edi-kraftwerk-simmering-wien-energie","status":"publish","type":"post","link":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/en\/taetigkeitsbereiche\/industrie\/ve-anlage-mit-uf-uo-edi-kraftwerk-simmering-wien-energie\/","title":{"rendered":"Full Demineralisation Plant with UF-RO-EDI, Simmering Power Plant, Wien Energie"},"content":{"rendered":"
Construction of a 2-line water treatment plant for the production of deionised water with the following treatment steps:<\/p>\n
Ultrafiltration, 2-pass reverse osmosis system, electrodeionisation. The system has a capacity of 15 m\u00b3 \/ h of ultrapure water (2 x 15 = 30m\u00b3 \/ h). In addition to conductivity, the silica is also measured at the outlet.<\/p>\n
In addition, a rinsing water \/ CEB \/ CIP cleaning station including dosing stations was installed.<\/p>","protected":false},"excerpt":{"rendered":"
Errichtung einer 2-stra\u00dfigen Wasseraufbereitungsanlage zur Erzeugung von Deionat mit folgenden Aufbereitungsschritten: Ultrafiltration, 2-passige Umkehrosmoseanlage, Elektrodeionisation. Die Anlage hat eine Kapazit\u00e4t von jeweils 15m\u00b3\/h Reinstwasser (2 x 15 = 30 m\u00b3\/h). Neben Leitf\u00e4higkeit wird auch die Kiesels\u00e4ure am Ausgang gemessen. Zus\u00e4tzlich wurde eine Sp\u00fclwasser-\/ CEB-\/ CIP Reinigungsstation inkl. Dosierstationen installiert.<\/p>","protected":false},"author":1,"featured_media":636,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25,21],"tags":[],"class_list":["post-1001","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrie","category-taetigkeitsbereiche"],"yoast_head":"\n