{"id":1018,"date":"2020-02-22T00:11:00","date_gmt":"2020-02-21T23:11:00","guid":{"rendered":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/jobs\/wva-tulln\/"},"modified":"2020-05-18T16:45:50","modified_gmt":"2020-05-18T14:45:50","slug":"wva-tulln","status":"publish","type":"post","link":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/en\/taetigkeitsbereiche\/emsr\/wva-tulln\/","title":{"rendered":"Water Supply Plant Tulln"},"content":{"rendered":"
Water supply, engineering, programming (Siemens S7 programmable logic controller, monitor wall, WinCC process control system), measurement technology, network control cabinets, assembly (system cabling, connection works), EDP equipment (office furniture, 8 monitors, air conditioning, cabling double floor), commissioning, year of construction 2011\/2012<\/p>","protected":false},"excerpt":{"rendered":"
Water supply, engineering, programming (Siemens S7 programmable logic controller, monitor wall, WinCC process control system), measurement technology, network control cabinets, assembly (system cabling, connection works), EDP equipment (office furniture, 8 monitors, air conditioning, cabling double floor), commissioning, year of construction 2011\/2012<\/p>","protected":false},"author":1,"featured_media":670,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24,21],"tags":[],"class_list":["post-1018","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-emsr","category-taetigkeitsbereiche"],"yoast_head":"\n