{"id":1020,"date":"2020-02-22T00:13:00","date_gmt":"2020-02-21T23:13:00","guid":{"rendered":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/jobs\/ara-wiener-neustadt\/"},"modified":"2020-05-18T16:45:24","modified_gmt":"2020-05-18T14:45:24","slug":"ara-wiener-neustadt","status":"publish","type":"post","link":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/en\/taetigkeitsbereiche\/emsr\/ara-wiener-neustadt\/","title":{"rendered":"ARA Wiener Neustadt"},"content":{"rendered":"
Adaptation and expansion of the wastewater treatment plant, engineering, programming (programmable logic controller Siemens S7), measurement technology, control cabinets, assembly (system cabling, connection works), commissioning, year of construction 2010-2011<\/p>","protected":false},"excerpt":{"rendered":"
Adaptation and expansion of the wastewater treatment plant, engineering, programming (programmable logic controller Siemens S7), measurement technology, control cabinets, assembly (system cabling, connection works), commissioning, year of construction 2010-2011<\/p>","protected":false},"author":1,"featured_media":674,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24,21],"tags":[],"class_list":["post-1020","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-emsr","category-taetigkeitsbereiche"],"yoast_head":"\n