{"id":985,"date":"2020-02-22T00:07:00","date_gmt":"2020-02-21T23:07:00","guid":{"rendered":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/jobs\/awv-bruck\/"},"modified":"2020-05-18T16:10:56","modified_gmt":"2020-05-18T14:10:56","slug":"awv-bruck","status":"publish","type":"post","link":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/en\/taetigkeitsbereiche\/abwasser\/awv-bruck\/","title":{"rendered":"AWV Bruck"},"content":{"rendered":"
Construction of an outfall channel system with a total capacity of 300 l\/s comprising of 17 pumping stations in total, including 3 main pumping stations. The supply included the mechanical equipping of the pumping stations with pumps, shut-off valves, dosing systems, hydraulic steel constructions as well control system.<\/p>","protected":false},"excerpt":{"rendered":"
Construction of an outfall channel system with a total capacity of 300 l\/s comprising of 17 pumping stations in total, including 3 main pumping stations. The supply included the mechanical equipping of the pumping stations with pumps, shut-off valves, dosing systems, hydraulic steel constructions as well control system.<\/p>","protected":false},"author":1,"featured_media":606,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,21],"tags":[],"class_list":["post-985","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-abwasser","category-taetigkeitsbereiche"],"yoast_head":"\n