{"id":989,"date":"2020-02-22T00:04:00","date_gmt":"2020-02-21T23:04:00","guid":{"rendered":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/jobs\/klaeranlage-suedoestliches-tullnerfeld\/"},"modified":"2020-05-18T16:10:06","modified_gmt":"2020-05-18T14:10:06","slug":"klaeranlage-suedoestliches-tullnerfeld","status":"publish","type":"post","link":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/en\/taetigkeitsbereiche\/abwasser\/klaeranlage-suedoestliches-tullnerfeld\/","title":{"rendered":"WWTP S\u00fcd\u00f6stliches Tullnerfeld"},"content":{"rendered":"
Extension and improvement of the waste water treatment plant up to 34,000 PE60 and adaptation to the state of art. The plant operates as a conventional biological treatment plant with anaerobic sludge stabilisation. Besides the biological treatment the whole sludge treatment line including digester, gas storage and recovery (combined heat and power plant) is installed.<\/p>","protected":false},"excerpt":{"rendered":"
Extension and improvement of the waste water treatment plant up to 34,000 PE60 and adaptation to the state of art. The plant operates as a conventional biological treatment plant with anaerobic sludge stabilisation. Besides the biological treatment the whole sludge treatment line including digester, gas storage and recovery (combined heat and power plant) is installed.<\/p>","protected":false},"author":1,"featured_media":613,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,21],"tags":[],"class_list":["post-989","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-abwasser","category-taetigkeitsbereiche"],"yoast_head":"\n