{"id":991,"date":"2020-02-22T00:06:00","date_gmt":"2020-02-21T23:06:00","guid":{"rendered":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/jobs\/klaeranlage-awv-goelsental\/"},"modified":"2020-05-18T16:10:41","modified_gmt":"2020-05-18T14:10:41","slug":"klaeranlage-awv-goelsental","status":"publish","type":"post","link":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/en\/taetigkeitsbereiche\/abwasser\/klaeranlage-awv-goelsental\/","title":{"rendered":"WWTP \u201cAWV G\u00f6lsental\u201d"},"content":{"rendered":"
Extension from 10,000 PE to 18,000 PE and adaption to the state-of-art of the municipal waste water treatment plant G\u00f6lsental. The plant is designed as a three-line activated sludge system with nitrification, pre-denitrification, precipitation of phosphate, and separate stabilisation of sludge. In the framework of this project the whole technical equipment has been replaced.<\/p>","protected":false},"excerpt":{"rendered":"
Ausbau und Erweiterung der Verbandskl\u00e4ranlage von 10.000 EW60 auf 18.000 EW60 sowie Anpassung an den Stand der Technik. Die Anlage ist als dreistra\u00dfige Belebungsanlage mit Nitrifikation, vorgeschaltener Denitrifikation, Phosphatf\u00e4llung und getrennter Schlammstabilisierung ausgef\u00fchrt. Im Rahmen der Arbeiten wurde die gesamte maschinentechnische Ausr\u00fcstung erneuert. Dies waren unter anderem: Rechen, Sandfang mit Sandw\u00e4scher, Vorkl\u00e4rbeckenr\u00e4umer, F\u00e4kalschlammannahmestation, feinblasige Tiefenbel\u00fcftung, […]<\/p>","protected":false},"author":1,"featured_media":617,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,21],"tags":[],"class_list":["post-991","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-abwasser","category-taetigkeitsbereiche"],"yoast_head":"\n