{"id":999,"date":"2020-02-22T00:26:00","date_gmt":"2020-02-21T23:26:00","guid":{"rendered":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/jobs\/gud-kraftwerkes-timelkam\/"},"modified":"2020-05-18T16:21:05","modified_gmt":"2020-05-18T14:21:05","slug":"gud-kraftwerkes-timelkam","status":"publish","type":"post","link":"https:\/\/www.gwt.at\/wasser-und-waermetechnik\/en\/taetigkeitsbereiche\/industrie\/gud-kraftwerkes-timelkam\/","title":{"rendered":"CCPP Timelkam"},"content":{"rendered":"
River water from the V\u00f6ckla river is used to cool the Timelkam combined cycle power plant.<\/p>\n
Under appropriate conditions (naturally unfavorable temperature conditions and \/ or river water quality) the cooling system is operated in circulation and requires treated river water as make-up water. The additional cooling tower water treatment provides this make-up water, which allows the cooling system to operate with a 3 to 4-fold thickening.<\/p>","protected":false},"excerpt":{"rendered":"
F\u00fcr die K\u00fchlung des GuD-Kraftwerkes Timelkam wird Flusswasser aus der V\u00f6ckla verwendet. Unter entsprechenden Bedingungen (ung\u00fcnstige Temperaturverh\u00e4ltnisse und\/oder Flusswasserbeschaffenheit) wird das K\u00fchlsystem als Umlaufk\u00fchlung betrieben und erfordert aufbereitetes Flusswasser als Zusatzwasser. Die K\u00fchlturmzusatzwasser-Aufbereitung (KZA) stellt dieses Zusatzwasser bereit, das einen Kreislaufbetrieb des K\u00fchlsystems mit einer 3 bis \u00a0max. 4-fachen Eindickung erm\u00f6glicht.<\/p>","protected":false},"author":1,"featured_media":632,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25,21],"tags":[],"class_list":["post-999","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrie","category-taetigkeitsbereiche"],"yoast_head":"\n