Construction of an outfall channel system with a total capacity of 300 l/s comprising of 17 pumping stations in total, including 3 main pumping stations. The supply included the mechanical equipping of the pumping stations with pumps, shut-off valves, dosing systems, hydraulic steel constructions as well control system.