The purification of wastewater ensures the preservation of our ecosystems and is a legal necessity. By using optimal purification processes and high-quality system components, we build efficient and reliable sewage treatment and purification plants that guarantee reliable compliance with the discharge limit values.
For the AWV Oberes Schwarzatal GWT could perform the extension as well as the adaptation of the sewage treatment plant to the state of the art.
The wastewater treatment plant was extended by a second line in the form of an activated sludge basin and a secondary clarifier to 10.000 PE60 while maintaining operation. The wastewater treatment plant is designed as an activated sludge system with sludge stabilization. In the course …
Construction of an outfall channel system with a total capacity of 300 l/s comprising of 17 pumping stations in total, including 3 main pumping stations. The supply included the mechanical equipping of the pumping stations with pumps, shut-off valves, dosing systems, hydraulic steel constructions as …
Extension from 10,000 PE to 18,000 PE and adaption to the state-of-art of the municipal waste water treatment plant Gölsental. The plant is designed as a three-line activated sludge system with nitrification, pre-denitrification, precipitation of phosphate, and separate stabilisation of sludge. In the framework of …
This waste water treatment plant was installed with a capacity of 3,400 PE. The biological part is designed as a SBR-technology with biological phosphorous removal, nitrification, de-nitrification and simultaneous stabilisation of sludge. The sludge is dewatered applying a centrifuge. Within a consortium our company was …
Extension and improvement of the waste water treatment plant up to 34,000 PE60 and adaptation to the state of art. The plant operates as a conventional biological treatment plant with anaerobic sludge stabilisation. Besides the biological treatment the whole sludge treatment line including digester, gas …
Construction of four flood water pumping stations with a total capacity of 3800 l/s including discharge into the Danube river and the adaptation of existing valve boxes. The scope of supply includes the pumps, whole mechanical equipment, electrical equipment, measurement technique and control system of …
Within the frame of the assignment the plant was extended and adapted to the state of the art. The extension of the plant took place without shutting down the continuous operation, and included the screw pumps, surface aeration and fine bubbles aeration, air compressors, pumps …
Within the frame of the assignment the plant of the waste water association Oberes Pinkatal was extended to 25,500 PE60 and adapted to the state of the art. The extension of the plant took place without shutting down the continuous operation, and included the installation …