Wastewater

Reliably Pure

The purification of wastewater ensures the preservation of our ecosystems and is a legal necessity. By using optimal purification processes and high-quality system components, we build efficient and reliable sewage treatment and purification plants that guarantee reliable compliance with the discharge limit values.

StuppachTW
Wastewater

WWTP Stuppach

For the AWV Oberes Schwarzatal GWT could perform the extension as well as the adaptation of the sewage treatment plant to the state of the art.

Read More
Kläranlage Alland
Wastewater

WWTP Alland

The wastewater treatment plant was extended by a second line in the form of an activated sludge basin and a secondary clarifier to 10.000 PE60 while maintaining operation. The wastewater treatment plant is designed as an activated sludge system with sludge stabilization. In the course …

Read More
Transportkanalanlagen mit einer Gesamtkapazität von 300 l/s bestehend aus 3 Haupt- und 14 Nebenpumpwerken
Wastewater

AWV Bruck

Construction of an outfall channel system with a total capacity of 300 l/s comprising of 17 pumping stations in total, including 3 main pumping stations. The supply included the mechanical equipping of the pumping stations with pumps, shut-off valves, dosing systems, hydraulic steel constructions as …

Read More
Kläranlage AWV Gölsental
Wastewater

WWTP “AWV Gölsental”

Extension from 10,000 PE to 18,000 PE and adaption to the state-of-art of the municipal waste water treatment plant Gölsental. The plant is designed as a three-line activated sludge system with nitrification, pre-denitrification, precipitation of phosphate, and separate stabilisation of sludge. In the framework of …

Read More
SBR-Anlage Dürnkrut
Wastewater

SBR-plant Dürnkrut

This waste water treatment plant was installed with a capacity of 3,400 PE. The biological part is designed as a SBR-technology with biological phosphorous removal, nitrification, de-nitrification and simultaneous stabilisation of sludge. The sludge is dewatered applying a centrifuge. Within a consortium our company was …

Read More
Kläranlage Südöstliches Tullnerfeld
Wastewater

WWTP Südöstliches Tullnerfeld

Extension and improvement of the waste water treatment plant up to 34,000 PE60 and adaptation to the state of art. The plant operates as a conventional biological treatment plant with anaerobic sludge stabilisation. Besides the biological treatment the whole sludge treatment line including digester, gas …

Read More
Hochwasserpumpwerke Spitz an der Donau
Wastewater

Flood water pumping station Spitz / Donau

Construction of four flood water pumping stations with a total capacity of 3800 l/s including discharge into the Danube river and the adaptation of existing valve boxes. The scope of supply includes the pumps, whole mechanical equipment, electrical equipment, measurement technique and control system of …

Read More
Kläranlage des AWV Wiener Neustadt Süd
Wastewater

WWTP AWV Wiener Neustadt Süd

Within the frame of the assignment the plant was extended and adapted to the state of the art. The extension of the plant took place without shutting down the continuous operation, and included the screw pumps, surface aeration and fine bubbles aeration, air compressors, pumps …

Read More
KA Riedlingsdorf
Wastewater

KA Riedlingsdorf

Within the frame of the assignment the plant of the waste water association Oberes Pinkatal was extended to 25,500 PE60 and adapted to the state of the art. The extension of the plant took place without shutting down the continuous operation, and included the installation …

Read More

Gwt.at uses cookies and asks your personal data to enhance your browsing experience (Privacy Policy).