Extension from 10,000 PE to 18,000 PE and adaption to the state-of-art of the municipal waste water treatment plant Gölsental. The plant is designed as a three-line activated sludge system with nitrification, pre-denitrification, precipitation of phosphate, and separate stabilisation of sludge. In the framework of this project the whole technical equipment has been replaced.