Extension and improvement of the waste water treatment plant up to 34,000 PE60 and adaptation to the state of art. The plant operates as a conventional biological treatment plant with anaerobic sludge stabilisation. Besides the biological treatment the whole sludge treatment line including digester, gas storage and recovery (combined heat and power plant) is installed.