Well water containing iron and humic substances is pre-cleaned by means of pressure ventilation and iron (III) chloride metering through a multi-layer filter. The required boiler feed water is generated via 3-line demineralisation (floating bed process) with a CO2 trickle and mixed bed filter (3 x 87 m³ / h).
2544 Leobersdorf
+43 2256 622 970
5020 Salzburg
+43 662 8726250
Monday - Thursday 07h - 16h
Friday 07h - 12h
Menu