Full Demineralisation Plant with UF-RO-EDI, Simmering Power Plant, Wien Energie

VE-Anlage mit UF-UO-EDI Kraftwerk Simmering

Full Demineralisation Plant with UF-RO-EDI, Simmering Power Plant, Wien Energie

Construction of a 2-line water treatment plant for the production of deionised water with the following treatment steps:

Ultrafiltration, 2-pass reverse osmosis system, electrodeionisation. The system has a capacity of 15 m³ / h of ultrapure water (2 x 15 = 30m³ / h). In addition to conductivity, the silica is also measured at the outlet.

In addition, a rinsing water / CEB / CIP cleaning station including dosing stations was installed.