FLORIDSDORF BATHS

The project involves comprehensive energy-efficiency upgrades and technical modernisation of the existing facility. The focus is on sustainably reducing energy consumption, improving the energy efficiency of the building services systems and optimising operations in the pool and wellness areas. Combining thermal improvements to the building envelope, renewable on-site power generation, modern ventilation and heating systems, and intelligent control and regulation technology will make the entire site future-ready and resource-efficient.

Key facts

Location

Vienna Floridsdorf

Services

Replacement of existing building lighting and underwater spotlights with LED fixtures, installation of a PV system, thermal renovation of the window façades (replacement of façade elements), installation of a sprinkler/irrigation system, replacement of pumps including pipework modifications with high-efficiency pumps and frequency converters, replacement of the sports pool heat exchanger with an efficient plate heat exchanger, supply and connection of a low-temperature HVAC heat exchanger, replacement of the filter media, new control station for pool water technology, supply and installation of new energy-efficient supply and extract air units, supply and installation of heat pumps, retrofitting of door contact switches to shut off sauna heaters, retrofitting of automatic timer-controlled shut-off for hair dryer stations, electrical, instrumentation, control and automation for sports, warm and cold pools

EEC/year - District Heating (Heat)

3,447.76 MWH/a

EEC/year - Electricity, active power

449.18 MWH/a 

EEC/year - Water / wastewater

23,807.21 m³/year


View more projects: