JÖRGERBAD

The project involves comprehensive technical and energy-efficiency upgrades to the indoor and outdoor swimming pool complex. Energy consumption will be sustainably reduced by replacing indoor and underwater lighting with LED technology, installing heat pumps and high-efficiency supply and exhaust air units, integrating a low-temperature heat exchanger, and fitting a cover to the outdoor pool. Water treatment and filtration will also be upgraded with variable-speed high-efficiency pumps, an IDM retrofit to reduce circulation, and modernized filter systems. Modern EICA technology, a new operator station for pool water systems, and door contact switches to automatically shut off the sauna heaters complete the efficiency and operational improvements.

Key facts

Location

Vienna Hernals

Services

Replacement of existing building lighting and underwater spotlights with LED fixtures, supply and connection of low-temperature HVAC heat exchangers, supply and installation of an outdoor pool cover, instrumentation, control and automation for the outdoor pool and indoor pool, replacement of pumps, including pipework modifications, with high-efficiency pumps and variable frequency drives, retrofit of IDM for reduced circulation capacity in the indoor pool, refurbishment of the outdoor pool filtration system, new control station for pool water treatment, supply and installation of new energy-efficient supply and extract air units, supply and installation of heat pumps, retrofit of door contact switches to shut off the sauna heaters

EEC / year - district heating (heat)

2,999.74 MWH/a

EEC / year – electricity, active energy

-6,55 MWH/a

EEC / Year - Water / Wastewater

31.017,17 m³/a


View more projects: