KONGRESS BATH

The project involves comprehensive energy and technical upgrades to the swimming pool complex serving the sports, multipurpose, and children’s pools. To provide sustainable energy and improve efficiency, a photovoltaic system and heat pumps will be installed, along with LED lighting throughout the indoor and outdoor areas, and a cover will be fitted to the sports pool. Water treatment and pumping systems will be upgraded with new filters for all pools, variable-speed high-efficiency pumps and adapted pipework, as well as a backwash water collection system with UV disinfection for irrigation reuse. Centralized EICA technology for all pool areas and a touch panel in the lifeguard’s booth will provide modern, centralized control.

Key facts

Location

Vienna-Ottakring

Services

Replacement of existing indoor and outdoor lighting with LED luminaires; supply and installation of filter systems for the multi-purpose, sports and children's pools; replacement of pumps with high-efficiency pumps, including pipework modifications and variable frequency drives; instrumentation, control and electrical engineering for the sports, multi-purpose and children's pools; supply and installation of a cover for the sports pool; installation of a PV system; supply and installation of heat pumps; backwash water collection system for irrigation, including UV disinfection; touch panel for the lifeguard station

EEC / year - district heating (heat)

1,829.06 MWh/year

EEC / year – electricity, active energy

6.42 MWH/a

EEC / Year - Water / Wastewater

33,265.64 m³/a


View more projects: